Operations - China
TEAL's newest manufacturing partner is our sister company SL Power Electronics.

SLPE's manufacturing facility is located in Xianghe, China, a province southeast of Beijing. SLPE's has had its own manufacturing in China since 1997 when it was originally established under the AULT® brand name. Since its beginnings, it has evolved into a world-class facility:
-
300,000 square feet (total plant area)
-
Six main production lines
-
-
Includes manufacturing, engineering, sales support and management personnel
-
Supports the manufacturing of high volume orders - both CONDOR™ and AULT® brand products
 |
 |
 |
SL POWER ELECTRONICS™’s high volume, world-class manufacturing facility is located southeast of Beijing, China in the province of Xianghe. |
Delivering high quality power solutions requires excellence in design engineering and the manufacturing procedures in-place to deliver high performance products. |
SL POWER ELECTRONICS™’s Xianghe plant has the manufacturing expertise as well as the dedication to detail required to meet even the most stringent OEM requirements. |
TEAL manufactures power subsystems worldwide using
ISO 9001:2000 certified
processes. Vertically integrated transformer manufacturing enables TEAL to provide industry
leading flexibility and lead times. Our world-class manufacturing is based on the following
principles:

Understanding that lead times and response times are imperative,
a team of highly experienced TEAL engineers, manufacturing personnel, customer service
representatives, field service engineers and sales engineers are dedicated to support each
customer.
TEAL Electronics, as a partner to our customer, will work and think as a part of
your team to help achieve your short and long term product and business goals and objectives.
We are always pro-active toward value engineering and resultant cost reductions to
keep our customer competitive in their markets.
Our engineering and manufacturing teams act pro-actively to improve the design
manufacturability and reliability as part of our process and business model.
Additional value added services include:
Complete test evaluation reports can be provided with all product shipments. The
detail of this final shipping documentation attests to the quality system that each
product passes through before each shipment.
Quick design cycles for product modifications, changes, and new product requests.
Design changes are typically evaluated and implemented in 6 weeks or less.
Our short lead-times and excellent on-time delivery history is in part a result of
our demand based and Intra-net enabled manufacturing system. Our manufacturing floor uses
only on-line drawings reflecting the latest customer and engineering changes.
Typical lead times after production start is 3 ½ weeks.
Let TEAL Power Your Technology!
|