ISO
9001-2000
Agency
Approvals
New Product
Development Process
Training Supply Chain
Optimization
Global
Operations
SL & Sister
Companies
RFQs How to Spec a
Power System
Articles Site
Prep

Operations - Mexico - TPE Tecate

 

TEAL's TPE de Mexico Logo

TEAL owns it's own Maquiladora, TPE Tecate (which stands for TEAL Power Electronics, Tecate). The facility is located in the scenic mountains of Tecate, Mexico, approximately 50 miles southeast of our San Diego headquarters.

TEAL currently uses the TPE faciltiy to produce our transformers and magnetics, wiring harnesses, and other sub-assemblies as well as several high volume product lines. TPE Tecate is certified to ISO under the same ISO 9001:2008 certificate as TEAL San Diego.

TEAL manufactures power subsystems worldwide using ISO 9001:2008 certified processes. Vertically integrated transformer manufacturing enables TEAL to provide industry leading flexibility and lead times. Our world-class manufacturing is based on the following principles:

world map

  • Understanding that lead times and response times are imperative, a team of highly experienced TEAL engineers, manufacturing personnel, customer service representatives, field service engineers and sales engineers are dedicated to support each customer.
  • TEAL Electronics, as a partner to our customer, will work and think as a part of your team to help achieve your short and long term product and business goals and objectives.
  • We are always pro-active toward value engineering and resultant cost reductions to keep our customer competitive in their markets.
  • Our engineering and manufacturing teams act pro-actively to improve the design manufacturability and reliability as part of our process and business model.

  • Additional value added services include:

  • Complete test evaluation reports can be provided with all product shipments. The detail of this final shipping documentation attests to the quality system that each product passes through before each shipment.
  • Quick design cycles for product modifications, changes, and new product requests. Design changes are typically evaluated and implemented in 6 weeks or less.
  • Our short lead-times and excellent on-time delivery history is in part a result of our demand based and Intra-net enabled manufacturing system. Our manufacturing floor uses only on-line drawings reflecting the latest customer and engineering changes.
  • Typical lead times after production start is 3 ½ weeks.

  • Let TEAL Power Your Technology!